Posts

Showing posts from March, 2021

March Goals

Image
 Lots of good intentions for March but not a lot of progress.  I was side tracked by other things. The blocks for the Longtime Gone quilt did get completed I'm having fun with this quilt.   When I traced the shapes and cut them for the applique on Love Entwined, I made a fundamental applique error.  I neglected to number the pattern and the tracings.  So I spent all of one Monday Sewing Session sorting the pieces out and numbering.  In the end I couldn't find a couple of pieces or figure out were a couple went so I tossed them and traced the missing ones.  Everything is numbered now and I did get a few pieces prepped and pinned in place but I still have a bunch more to prep.  Baby Steps.   I can get a long way with baby steps. The guild BOM went back on the design wall in the layout for the smaller of the two options.  The more I look at it, the more I don't like the row of northwind blocks down the left side.  They are no...

March 2021 One Monthly Goal

Image
 This months goals are going to be similar to last months goals.  I have three blocks to complete for the Long Time Gone quilt.  That class is March 18th so I need to get going.  There are two churn dash block collections and the large plus block with start block.  Hoping that more blue and white scraps will get used up although I do have some fat quarters and yardage to use if I need more than what is in the boxes. I also want to finish the last block for the guild block of the month and start the assemble of the top.  Ideally I'll complete the top this month.  I believe that I'll go with the smaller size.   And finally I want to prepare some additional pieces for the Love Entwined top.  I think I'll work on blossoms for one of the completed vases.  I'd like to prepare all the pieces for one vase.  If I could stitch half of them down that would be really good.   I'm looking forward to having the guild BOM made into a...