January One Monthly Goal
I didn't do much stitching the last half of last year but I did eventually finish the rug that was my One Monthly Goal in June (the last time I participated).
In December, I quilted two tops. A gravity quilt and the guild BOM top.
My goal is to get them both trimmed and bound. I'd like to be able to take them for Show and Tell and the next guild meeting.
I'm also working on piecing the stars for Common Bride. Since the diamonds are so small, I'm doing the first part by hand. The diamonds are in my purse so I can work on them when I'm out. Four are to the point that they need the corner triangles. The next 4 are in progress. Getting these to the point they need corner triangles this month would be a bonus.
Joining up with Patty's One Monthly Goal
In December, I quilted two tops. A gravity quilt and the guild BOM top.
guild BOM - Pinwheels and Rail fence |
Gravity |
I'm also working on piecing the stars for Common Bride. Since the diamonds are so small, I'm doing the first part by hand. The diamonds are in my purse so I can work on them when I'm out. Four are to the point that they need the corner triangles. The next 4 are in progress. Getting these to the point they need corner triangles this month would be a bonus.
Joining up with Patty's One Monthly Goal
Good luck! I really like your "Gravity"!
ReplyDeleteLovely quilts you will be sharing. Thanks for linking up with Elm Street Quilts One Monthly Goal and good luck on your project!
ReplyDeleteThe gravity is fantastic!
ReplyDelete